240V 600V
Permeable Not Permeable
Insulated Not Insulated
The Following is a
Cost Estimation
Issued on
Est. Install Time
(Crew of 2 people) |
Subtotal | |||
---|---|---|---|---|
Heated Pavement Products | ||||
Heating Cables Supply and install High quality 10 year warranty commercial grade heating cables at 36 w/ft2 to ensure least amount of electrical draw on the building. Label all cables, Test before, during and after installation. Covering at least 95% of total heated area. |
Est. Install Time ( Crew of 2 people ) |
Subtotal |
||
Cable Ties And Anchors |
Subtotal |
|||
Panel Supply main heated pavement contactor panel on 3/4" plywood. Bring all cables into building, and connect them to snowmelting panel. All electrical work done by certified electrician |
Est. Install Time ( Crew of 2 people ) |
Subtotal |
||
Controller Supply and setup integrated sensor-less preheating controller for maximum performance. This controller operates with a preheating monitoring service. The customer will need to enroll in the monitoring package of their choice to activate the functionalities of the controller. |
Est. Install Time ( Crew of 2 people ) |
Subtotal |
||
Preparation Products | ||||
Stabilizing Grid Supply and install 1.75" plastic stabilizing grid to anchor cables and weigh down rigid insulation, and fill with 1/8" angular clean gravel. |
Est. Install Time ( Crew of 2 people ) |
Subtotal |
||
Rigid Insulation Supply and install 60 PSI rigid insulation to maximize energy efficiency and increase performance. |
Est. Install Time ( Crew of 2 people ) |
Subtotal |
||
Notes to Contractor | ||||
- It is the responsibility of the landscape contractor to ensure adequate drainage of their paving surface. | ||||
- This price does not include any landscaping preparation work or cable embedment / paving work, that cost is to be added above and beyond this quote. | ||||
- Any time the total requested power is more than half of the building's capacity, It is highly recommended to have the project evaluated by a qualified electrician prior to engaging in the project. | ||||
- This price does not include supplying the contactor panel with power, this will be estimated after an electrician's onsite visit. | ||||
- The labour time is displayed as a time per 2 person crew | ||||
Total |
Total Est. Install Time ( Crew of 2 people ) |
Total Est. Cost |
||
Total Price After Heethr Member Discount: | ||||
Thank you for being an early member | ||||